India's best property portal to buy property in India - Proptiger.com
Possession : Nov'28
Rera
P M AL Noor
Price on request
Builder Price
Configuration
3, 4 BHK
Carpet Area1 sq M = 10.76 sq ft
1,235 - 3,060 sq ft
Possession Status
Under Construction
Overview
  • Possession Start Date
    Nov'28
  • Status
    Under Construction
  • Total Area
    2.13 Acres
  • Total Launched apartments
    210
  • Launch Date
    Jun'25
  • Availability
    New
  • RERA ID
    PR/GJ/AHMEDABAD/AHMEDABAD CITY/AUDA/MAA12442/131023

Project Specifications

Doors
Internal:
Decorative Laminate
Main:
Decorative Main Door
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Other Bedroom:
Vitrified/Marble Tiles
Walls
Exterior:
ACE Paint
Interior:
Acrylic Emulsion Paint
Toilets:
Ceramic Tiles
Kitchen:
Anti Skid Tiles Dado
Fittings
Kitchen:
Provision For Water Purifier and Exhaust Fan
Toilets:
Branded CP Fittings & Sanitary Ware, Anti-Skid Tiles
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Kitchen
Windows:
Aluminium Powder Coated Glazed Windows
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
P M AL Noor Floor Plans
  • 3 BHK
  • 4 BHK
-
-
P M AL Noor Amenities

About P M Reality

  • Total Projects1
  • Ongoing Projects1

More projects by P M Reality

Similar Projects

Developer Network

  • 400+
    Reputed Developers