India's best property portal to buy property in India - Proptiger.com
Possession : Feb'24
SNDR Meadows
Price on request
Builder Price
Configuration
2, 3 BHK
Builtup area1 sq M = 10.76 sq ft
1,040 - 1,220 sq ft
Possession Status
Completed
Overview
  • Possession Start Date
    Feb'24
  • Status
    Completed
  • Total Launched apartments
    10
  • Launch Date
    Jan'23
  • Availability
    Resale

Project Specifications

Doors
Main:
Teak Wood Frame
Internal:
Teak / Sal Wood Door Frames
Flooring
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Others
Points:
Hall
Wiring:
Concealed copper wiring
Windows:
UPVC windows
Frame Structure:
RCC framed structure
Switches:
Modular switches
Walls
Toilets:
Ceramic Tiles
Kitchen:
Ceramic Tiles
Exterior:
Paint, Distemper
Interior:
Putty on Walls
Fittings
Kitchen:
Modular Kitchen
Toilets:
Branded CP Fitting
SNDR Meadows Floor Plans
  • 2 BHK
  • 3 BHK
-
-
SNDR Meadows Amenities

Payment Plans

Payment Plan

About SNDR Constructions

  • Total Projects1
  • Ongoing Projects0

More projects by SNDR Constructions

Similar Projects

Developer Network

  • 400+
    Reputed Developers