Read In:

Now, Drive From Delhi To Mumbai In 12 Hours

March 08 2019   |   Surbhi Gupta

The Delhi-Mumbai Expressway is all set to become a reality in next three years as Transport Minister Nitin Gadkari on March 8 laid the foundation stone of this Rs 90,000-crore mega project. Those taking the road will be able to travel between national capital Delhi and financial capital Mumbai within 12 hours — it takes between 16 and 20 hours to do that currently.

While work has started only on some stretches of the highway, the National Highways Authority of India (NHAI) in December last year approved a plan to extend it to the Ring Road near the DND flyway in the national capital. For this, a six-lane 59-km access-controlled road from the Western Peripheral Expressway (WPE) near Sohna will be built, consequently bringing Manesar closer to Delhi. 

The plan

The project, which is part of the Bharatmala Pariyojna, will be developed in four phases, of which, the work on first and the last stretch is already underway – Delhi to Jaipur and Vadodara to Mumbai.

The project will further open up two of the country’s most backward districts —Mewat in Haryana and Dahod in Gujarat, connecting these two with the expressway.

The final route will be Delhi-Gurugram-Mewat-Kota-Ratlam-Godhra-Vadodara-Surat-Dahisar-Mumbai.

Once operational, travelling by road between Delhi and Mumbai would be faster than the existing train connectivity which takes 16 hours minimum. It would be an access-controlled highway for which the maximum speed limit has been set at 150 kilometre per hour. The new route will reduce the total distance between the two metro cities by 106 km. The super expressway coming up between Delhi and Jaipur would also decongest the National Highway-8 and would end at Jaipur Ring Road, cutting the total travel time by four hours. While the total distance will be reduced by just 40 km, the increased permissible limit will reduce the total time taken for completing the journey.

The timeline

The authorities are already under the process of land acquisition for the Delhi-Jaipur stretch, which is scheduled be completed within next 15 months. For the last stretch between Mumbai and Vadodara, the Centre has started awarding construction project at a tune of Rs 44,000 crore.

Other projects under Bharatmala 

Gadkari has also announced other expressways that are recently approved, including Ahmedabad-Dholera, Delhi-Meerut, Kanpur-Lucknow, Chennai-Bengaluru and Delhi-Amritsar-Katra. The first phase of the Delhi-Meerut Expressway will be opened on April 15.




Similar articles

Quick Links

Property Type

Cities

Resources

Network Sites